shapka_top_eng.jpg


Georgia. Vartsikhe HPP

Put into operation in 1972.

Upgrade of Hydroelectric Unit No. 2 at HPP-1 with complete generator replacement, upgrade of the regulation system and automated operation system. At the same time the increase in capacity is 3 MW.

  • Installed capacity of one hydroelectric unit Ц 23 MW;
  • Hydroelectric Generator Ц —¬866/70-52ћ ”’Ћ4, synchronal, triphase, vertical;
  • Turbine Ц ѕЋ20-¬-500;
  • Capacity Ц 23,800 kW;
  • Revolutions per minute Ц 115.4;
  • Rated head Ц 14.92 m.