shapka_top_eng.jpg


Kaniv hydroelectric power plant

  • Year of construction - 1972-1975;
  • Number of hydroelectric units 24;
  • PJSC Dnipro-SGEM assembled 24 hydroelectric unit;
  • Installed capacity of one hydroelectric unit - 22 MW;
  • Generator -2-538/160-70 -4;
  • Turbine horizontal bulb-type -15-684--600;
  • Turbine wheel diameter 6.0 m;
  • Design head 15.7 m.

Kanevskaya HPP

hydroelectric units

hydroelectric generator

Generator

Turbine - horizontal bulb-type

Turbine