shapka_top_eng.jpg

Kaniv hydroelectric power plant

  • Year of construction - 1972-1975;
  • Number of hydroelectric units Ц 24;
  • PJSC УDnipro-SGEMФ assembled 24 hydroelectric unit;
  • Installed capacity of one hydroelectric unit - 22 MW;
  • Generator Ц — √-2-538/160-70 м ”’Ћ-4;
  • Turbine Ц horizontal bulb-type ѕЋ-15-684-√-600;
  • Turbine wheel diameter Ц 6.0 m;
  • Design head Ц 15.7 m.

Kanevskaya HPP

hydroelectric units

hydroelectric generator

Generator

Turbine - horizontal bulb-type

Turbine