Kakhovka hydroelectric power plant

  • Commissioned during the construction years 1955-1956;
  • Number of hydroelectric units 6;
  • PJSC Dnipro-SGEM assembled 6 hydroelectric unit;
  • Installed capacity of one hydroelectric unit 57.2 MW;
  • Generator 1-4: 1340/150-96, 5-6: 134/150-96;
  • Turbine 1-4: Kaplan 20--800, 5-6: 548 -800;
  • Turbine wheel diameter 8m;
  • Design head - 14m.  