Alexandrovskaya hydroelectric power plant

Alexandrovskaya hydroelectric power plant

  • Commissioning date – 1999;
  • Number of hydroelectric units – 2;
  • OJSC “Dnepr-SHEM” assembled 2 hydroelectric unit;
  • Installed capacity of one hydroelectric generator – 5.75 MW;
  • Generator – ÑÂ 375/125-28 ÓÕË4;
  • Turbine – ÏË-20-Â-280;
  • Turbine wheel diameter – 2.8 m;
  • Design head – 14.5m.