Alexandrovskaya hydroelectric power plant

  • Commissioning date Ц 1999;
  • Number of hydroelectric units Ц 2;
  • PJSC УDnipro-SGEMФ assembled 2 hydroelectric unit;
  • Installed capacity of one hydroelectric generator Ц 5.75 MW;
  • Generator Ц —¬ 375/125-28 ”’Ћ4;
  • Turbine Ц ѕЋ-20-¬-280;
  • Turbine wheel diameter Ц 2.8 m;
  • Design head Ц 14.5m.