Kazakhstan. Bukhtarminskaya HPP

  • Period of construction - 1953-1966;
  • Number of hydroelectric units Ц 9;
  • PJSC УDnipro-SGEMФ has executed reconstruction of one hydro unit;
  • Installed capacity of each hydraulic unit Ц 75 MW;
  • Turbine Ц –ќ 70/0937-¬410;
  • Generator Ц —¬Ѕ-850/190-48;
  • Turbine wheel diameter Ц 8,5 m;
  • Design head Ц 61 m.