shapka_top_eng.jpg


News 2017

November December

Major repairs of hydro units:
  1. Kyiv PSPP - major repairs of hydro mechanical equipment;
  2. Kaniv HPP - major repairs of gates and gratings;
  3. Srednodniprovskaya HPP generator of hydro unit 5, overhaul of the gates;
  4. Dnipro HPP-1 hydro units 6,8;
  5. Dniester HPP-1 hydro unit 4;
  6. Alexandrovskays HPP overhaul of seed governing systems (Customer NNEGS Energoatom);
  7. Overhaul of the Dnipro-Ingulets Canal, Customer Management of the Dnipro-Ingulets Canal.
Reconstruction of hydro units:
  1. Kaniv HPP hydro units 1, 3 replacement of turbines and generators;
  2. Srednodniprovskaya HPP hydro unit 5 replacement of turbine shaft;
  3. Kakhovka HPP hydro unit 1 replacement of the runner case;
  4. Modernization of turbine guide vane blades for Tashlyk PSPP on the basis of SGEM in the city of Kaniv.
Construction and installation works:
  1. Dniester PSPP hydro unit 4;
  2. Tashlyk PSPP hydro unit 3 (Customer NNEGS Energoatom).
Foreign economic activity of the company:

The Republic of Tajikistan:

  1. Rogun HPP - assembly of generators No. 5,6 on site;
  2. Nurek HPP - overhaul of the ball valve of hydro unit No. 9;
  3. Nurek HPP - reconstruction of hydro unit 9 with the replacement of the runner.

September October

Major repairs of hydro units:

  1. Kyiv HPP - hydro unit 6;
  2. Kyiv PSPP - hydro unit 15;
  3. Kaniv HPP hydro units 23,24
  4. Kaniv HPP - overhaul of the containment grids and gates;
  5. Kremenchuk HPP - hydroelectric unit No.3;
  6. Srednodniprovskaya HPP - hydro unit 5;
  7. Srednodniprovskaya HPP - overhaul of the gates;
  8. Dnipro HPP-1 - hydro units No. 6,8;
  9. Dnipro HPP-1 - overhaul of the gates;
  10. Kakhovka HPP - hydro unit 4;
  11. Dniester HPP hydro unit 3;
  12. Tashlyk PSPP - overhaul of hydro units (Customer NNEGS Energoatom);
  13. Alexandrovskaya HPP - overhaul of hydroc units (Customer NNEGS Energoatom);
  14. Overhaul of the Dnipro-Ingulets Canal, Customer Management of the Dnipro-Ingulets Canal.

Reconstruction of hydro units:

  1. Kaniv HPP hydro unit No. 1,3 with complete replacement of turbines and generators;
  2. Srednodniprovskaya HPP - hydro unit 5 with replacement of the turbine shaft;
  3. Kakhovka HPP - hydro unit No. 1 with complete replacement of the runner chamber and working mechanisms of the turbine.

Construction and installation work:

  1. Dniester PSPP - aggregate assembly of the turbine stator and spiral chamber on site (general contractor PJSC "Turboatom", Customer PJSC "Ukrhydroenergo");
  2. Tashlyk PSPP installation of hydro unit No.3(Customer NNEGS Energoatom).

Foreign economic activity of the company:

The Republic of Tajikistan:

  1. Rogun HPP - assembly of generators No. 5,6 on site;
  2. Nurek HPP - overhaul of the ball valve of hydro unit No. 9;
  3. Nurek HPP - reconstruction of hydro unit 9 with the replacement of the runner.

Georgia Vartsikhe HPP - works on overhaul with the modernization of hydro unit 5.


July-August

Participation in tenders:

1. Capital repair at the Tashlyk HPP-HPSP cascade (Customer - NAEK Energoatom);

2. Reconstruction of two units (rotary-blade turbines and generators) of the Srednodneprovskaya HPP, Customer PrJSC "Ukrhydroenergo" - participation together with PJSC "Turboatom" and Andritz Hydro.

3. Reconstruction of two units (rotary-bladed turbines and generators) Dnipro HPP-2, Customer PrJSC "Ukrhydroenergo" - participation together with PJSC "Turboatom" and Andritz Hydro.

4. Reconstruction of two units (rotary-blade turbines and generators) of the Kremenchug HPP, Customer PrJSC "Ukrhydroenergo" - participation together with PJSC "Turboatom" and Andritz Hydro.

5. Reconstruction of hydro mechanical equipment (gates and suction gratings) for Kremenchugskaya HPP and Kakhovskaya HPP.

Major overhaul of hydro units of PrJSC "Ukrhydroenergo":

1. Kiev HPP (Ukraine) - hydro unit 8;

2. Kiev HSPP (Ukraine) hydro unit 4;

3. Kaniv HPP (Ukraine) - hydro units 4, 21;

4. Srednodniprovskaya HPP (Ukraine) - hydro unit 1;

5. Dnipro HPP-1 (Ukraine) - hydro unit 6;

6. Kakhovka HPP (Ukraine) - hydro unit 3.Overhaul of hydro unit 1 of Tashlyk HSPP (Ukraine).

Overhaul of the gates of Dnestrovskaya HPP-1 and Srednodniprovskaya HPP (Ukraine).

Reconstruction of hydro units of PrJSC "Ukrhydroenergo":

1. Kaniv HPP - hydro units 1,3 with complete replacement of the working mechanisms of the turbine; replacement of stator generators in the station;

2. Kremenchug HPP - hydro unit 8, with a complete replacement of the turbine and generator.

Construction and installation works:

1. Dnister HSPP hydro unit 4, co-assembly of the cone of the suction pipe (General contractor - PJSC "Turboatom", Customer - PrJSC "Ukrhydroenergo");

2. Assembling hydro unit 3 of Tashlyk HSPP (Customer - NAEK Energoatom).

Foreign economic activity of the company:

The Republic of Tajikistan:

1. Rogun HPP - assembly of generators 5,6 on the installation site;

2. Nurek HPP - major repairs of the ball valve of hydro unit 9;

3. Nurek HPP - reconstruction of hydro unit 9 with replacement of runner.


January-May

Participation in tenders:

1. Overhaul of the hydro unit No. 2 of the Kruonis HPSP, Lithuania, Customer - "Lietuvos energijos gamyba", AB;

2. Reconstruction of 4 hydro generating units of the Toktogul HPP in the Kyrgyz Republic, capacity of one hydro unit - 350 MW;

3. Overhaul, with replacement of the runner, hydro unit No. 9 of Nurek HPP in the Republic of Tajikistan (capacity of the unit 335 MW), Customer - OAKHK "Barki Tojik";

4. Dismantling, overhaul and installation of a pre-turbine ball valve with a diameter of 4200 mm of hydro unit No. 9 of Nurek HPP in the Republic of Tajikistan, Customer - OAKHK "Barki Tojik";

5. Reconstruction of two hydro units No. 1, 2 of Srednodneprovska HPP, Ukraine, Customer - PJSC "Ukrhydroenergo";

6. Jointly with PJSC "Turboatom" (Ukraine), STM Power (Slovakia) and Alstom (France) - reconstruction of two hydro units of Slapy HPP in the Czech Republic.

7.Reconstruction of two hydro units No. 14, 16 Dnipro- HPP-2, Ukraine, Customer - PJSC "Ukrhydroenergo";

8. A contract was signed for the reconstruction of two units (including seven turbines, seven generators and eight auxiliary systems) of Kaniv HPP, Ukraine, Customer - PJSC "Turboatom", the beginning of works 01.06.2018; The end 01.08.2021.

9. A contract was signed for the reconstruction of three hydroelectric units of Kiev HPSP, Ukraine, Customer - PJSC "Turboatom", the beginning of works - 01.06.2018; The end 01.08.2021.

Reconstruction works are carried out at the following stations:

1. Kaniv HPP hydro units 1,3;

2. Kremenchug HPP - hydro unit 8.

Major repair works are carried out at the following stations:

1. Kyiv HPP - hydro unit No. 12;

2. Dnipro HPP-1 hydro unit 7;

3. Dniestr HPP-1 - overhaul of the gates;

4. Srednodneprovska HPP - repair of auxiliary equipment.

Works of the assemble hydro unit No. 3 of Tashlyk HPSP.

Works outside Ukraine:


1. Assembly and installation of two hydro generators of the Rogun HPP in the Republic of Tajikistan;

2. Preparing for the overhaul of hydro unit No. 9 of the Nurek HPP in the Republic of Tajikistan.

Something new in SGEM`s work:

1. Purchased equipment for measuring the dynamic state of hydro units and pumps. The first vibration tests of the hydro unit No. 1 of the Tashlyk HPSP in the generator mode were carried out. Certified specialists for these works have been trained;

2. We developed a design and manufactured a device for static balancing of radial-axial runner of the Tashlyk HPSP. Work on static balancing is carried out.

3. An agreement was concluded with SS South-Ukraine NPP for designing a system of automatic protection and modernization of speed regulators for hydroelectric generators at the Aleksandrovka HPP.